News
Karachi Water Supply to Drop by 130 Million Gallons During Dhabeji Maintenance on November 13

By Mariam Khan
Real Estate Analyst
2 min read
News

By Mariam Khan
Real Estate Analyst
2 min read
The Karachi Water and Sewerage Corporation (KWSC) has announced a planned electricity shutdown at the Dhabeji pumping station on November 13, 2026, followed by further maintenance, according to a report published on November 12. The first shutdown is expected to cut daily water supply from about 650 million gallons to 520 million gallons. The figures are KWSC's estimates for the shutdown, and the reports we have seen do not say how long the shutdown will last.
The drop is 130 million gallons a day (our own calculation), or 20 percent of the normal supply of 650 million gallons (our own calculation). Areas that may be affected include Clifton, Saddar, Korangi, Malir and Gulshan-e-Iqbal, along with several others. The report as we have it does not give the full list of areas, say which parts of each area will be hit hardest or give the hours of the shutdown. It does not say what the "further maintenance" will involve or when it will happen, so we do not describe it.
It is not known how long supply will be reduced after the shutdown ends, whether tankers will be arranged for the worst-hit areas or who is supplying the electricity work. We make no prediction about how quickly supply will return to normal. Provincial announcements are published by the Government of Sindh.
Residential buildings, commercial properties and construction sites in the affected areas may need alternative water arrangements during the disruption. This is a short-term supply issue. The report does not link it to property values, and no effect on values has been established.
Households and businesses in the named areas should store water before November 13 and check KWSC's notices for the hours. Construction sites that depend on the network should arrange tankers in advance. The signals to watch are KWSC's notice on the hours of the shutdown, the date of the further maintenance and the restoration of full supply.
LDA approves verified GPA-based plot transfers in LDA City, making property transactions easier for overseas Pakistanis through authorised representatives.
SBP raises the gemstone sector's export payment limit from 10% to 30%, giving exporters greater flexibility in managing international trade payments.
Pakistan's property files often trade like financial assets, but unclear ownership rights and weak disclosure can expose buyers to legal and investment risks.
Prime Minister Shehbaz Sharif targets Rs1 trillion in Apna Ghar housing loans within six months, urging banks to simplify financing requirements.