News
LDA Announces Auction of 133 Residential and Commercial Sites in Lahore

By Mariam Khan
Real Estate Analyst
2 min read
News

By Mariam Khan
Real Estate Analyst
2 min read
The Lahore Development Authority (LDA) has reportedly listed 133 residential and commercial plots and other sites for sale or rental, with bidding scheduled for November 3, 2026 at Expo Centre, Lahore. The listing was reported on October 15. The details below should be confirmed against the LDA's own auction notices before they are relied on. Provincial announcements are published by the Government of the Punjab.
The figure of 133 sites is reported from the LDA's auction notices. The reports we have seen do not give the locations, plot sizes, reserve prices or registration deadlines, and they do not say how many of the sites are for sale and how many for rental. We therefore cannot describe individual plots, and we do not estimate prices.
The listing is described as covering residential and commercial plots and other sites. The reports do not say what the other sites are, or whether the plots are in LDA schemes or elsewhere. We do not assume anything about the type of site beyond what was reported.
Auctions by a development authority give investors and commercial developers a chance to buy or rent sites, and the results can show what bidders are willing to pay. That is a general point. The reports give no past prices for comparison, and we make no prediction about the November 3 results.
Investors and developers interested in the sites should get the official notices from the LDA, check eligibility, registration and payment terms, and verify the status of each plot before bidding. The signals to watch are the LDA's published list of sites, the registration deadline, the reserve prices and the results of the bidding on November 3.
Special Branch report flags safety gaps at College Road construction works in Rawalpindi after a child falls into an uncovered drain, prompting safety directives.
Federal Directorate of Education considers an engineering wing to manage repairs at 79 Islamabad schools and colleges, while CDA repairs five other buildings.
Rawalpindi WASA requests CDA to demarcate and transfer approximately 13 acres of land linked to Khanpur Dam's water supply, storage and pipeline infrastructure.
CDA reports over 41% progress on Islamabad Expressway's 8.5 km Service Road East, with all 153 underpass piles completed and drainage work continuing.