News
Pakistan Introduces Smart Power Management System to Reduce Load-Shedding

By Mariam Khan
Real Estate Analyst
2 min read
News

By Mariam Khan
Real Estate Analyst
2 min read
The government plans to introduce an Asset Performance Management System, initially in Lahore and Kasur, to identify electricity theft and losses at transformer level instead of disconnecting entire feeders. The plan was reported on October 20, 2026. More targeted load management could eventually improve electricity reliability for homes, commercial properties and industrial facilities. Power sector policy is published by the Power Division, and distribution matters in the Lahore region by the Lahore Electric Supply Company.
At present, load-shedding to control losses can affect an entire feeder, including consumers who pay their bills. The new system is meant to find theft and losses at the level of individual transformers, so that action can be limited to the areas where the problem lies. The reports we have seen do not explain how the system works, what data it uses or how consumers will be informed. We therefore describe the aim as stated and do not say how well it will work.
The system is planned initially for Lahore and Kasur. The reports do not say when it will start, how much it will cost, who will pay for it or when it will extend to other areas. They also do not say that load-shedding has been reduced anywhere. It is therefore a plan and not a result.
Reliable electricity matters for homes, shops, offices and factories, and it is a factor in how usable a property is. The reports do not link the system to property prices or rents, and any improvement would depend on the system being installed and used effectively. We do not claim any effect on values.
Households and businesses in Lahore and Kasur should not expect an immediate change in load-shedding. Landlords of commercial buildings can note that more targeted measures could in time mean fewer outages for paying consumers, but this is not promised. The signals to watch are the start date of the system, the number of transformers covered, any published change in outage hours and any extension beyond the first two districts.
Rawalpindi WASA requests CDA to demarcate and transfer approximately 13 acres of land linked to Khanpur Dam's water supply, storage and pipeline infrastructure.
CDA reports over 41% progress on Islamabad Expressway's 8.5 km Service Road East, with all 153 underpass piles completed and drainage work continuing.
ISMO's revised power plan identifies $9.18 billion in transmission investments and 1,740 MW of battery storage by FY2036 to strengthen Pakistan's electricity grid.
Clifton residents protest alleged ongoing construction at Nehr-i-Khayyam in Karachi despite a Sindh High Court order, raising concerns over high-rise development.