Guide
The 6-Lane Main Jinnah Avenue Expansion: Unlocking DHA Margalla Enclave & Park View City Islamabad

By wajahat Ali
Real Estate Analyst
Updated 8 min read
A major infrastructure transformation is underway in CDA Zone 4, Islamabad. The construction of the massive 6-lane road through DHA Margalla Enclave toward Park View City is drastically restructuring travel times, connectivity, and real estate valuations across the capital's eastern corridor.
Park View City Islamabad has long been admired for its Downtown lake, dancing fountains, and Margalla views, but its value has always been tied to how easily people can reach it through a small number of approach roads in Zone IV. Any upgrade to that corridor changes the daily commute and the investment case at the same time. Before looking at the new road itself, our Park View neighbourhood guide covers the society's blocks, amenities, approvals, and development status, giving useful context for how access improvements may play out.
This article looks at the expansion of Main Jinnah Avenue through DHA Margalla Enclave, the Park Road underpass, current construction status, and what the corridor means for property values and the planned eastern bypass. Road projects tend to show up in asking prices before they are finished. Comparing current Park View sale inventory helps you judge how much of the expected improvement sellers have already built into their prices.
Developed along Main Jinnah Avenue (formerly Kuri Road), this up-to-300-foot-wide central boulevard bypasses the old, single-lane bottlenecks of Main Park Road. Combined with a dedicated underpass at the Park Road intersection, it provides signal-free access connecting central Islamabad directly to the gates of premium housing societies.
Strategic Overview: Distances & Commute Impact
The widening of Jinnah Avenue into a seamless 6-lane road brings formerly distant sectors into close proximity with Islamabad’s commercial hubs. Below is the updated spatial data for travel times and distances utilizing the new route:
| Target Destination from the 6-Lane Corridor | Approximate Distance | Estimated Travel Time |
|---|---|---|
| Park Road Intersection | ~3 km | 2–3 minutes |
| Park View City Core | ~4 km | 4–5 minutes |
| Bahria Enclave Entrance | ~6 km | 8 minutes |
| Murree Road / Rawal Chowk Flyover | ~6.5 km | 10 minutes |
| Zero Point & Blue Area | ~10 km | 15 minutes |
| Srinagar Highway Link | ~9.5 km | 15 minutes |
Key Drivers of the Jinnah Avenue Expansion Project
1. Elite, Signal-Free Connectivity
The core advantage of this project is the removal of structural friction. Commuters heading toward Zone 4 previously endured heavy rush-hour gridlock near Taramri Chowk and single-lane bottlenecks. The 220-to-300-foot-wide boulevard acts as an alternative high-speed arterial highway. The addition of the Park Road Underpass eliminates traditional intersections, allowing uninterrupted high-speed transitions from central Islamabad into the foothills of the Margalla range.
2. Dual Government Backing (CDA + DHA Joint Venture)
The 6-lane road slices directly through DHA Margalla Enclave, a massive 10,000-Kanal housing society. Because Margalla Enclave is an official joint venture between the Capital Development Authority (CDA) and the Defence Housing Authority (DHA), the infrastructure enjoys unmatched execution priority and absolute legal security (NOC approved). Heavy machinery and engineering teams operate on a 24/7 rotation to complete asphalt laying and structural underpass work.
3. Elimination of Access Constraints for Park View City
While the Vision Group's Park View City Islamabad has long been praised for its premium amenities—such as the 100-Kanal Downtown Lake, dancing fountains, and scenic mountain views—its primary limitation was its dependent approach route. The completion of this 6-lane gateway bypasses historical bottlenecks, offering a direct, high-capacity entry point that turns the project into a highly practical residential choice for daily commuters to the Blue Area.
Current On-Ground Development Status & Paving Timelines
Development along this arterial corridor has shifted into an aggressive execution phase, backed by the joint engineering resources of the CDA and DHA.
Main Jinnah Avenue Asphalt Carpeting
The transformation of Jinnah Avenue into a sprawling 6-lane boulevard is moving through its final structural phases.
- Current Status: Heavy earthwork, grading, and base-course preparation are 100% complete across the core DHA Margalla Enclave and Park View City approach sectors. Asphalt carpeting is underway on the main boulevard as well as the connecting internal 40-foot streets of Blocks ME-1 and ME-2. Engineering teams are laying the underground utility networks (sewerage, water lines, and fiber-optic grids) ahead of the final surface paving to prevent future road cutting.
- Expected Completion Date: Final asphalt carpeting and lane markings on the primary corridor are on track for full operational completion by late Q3 2026 / early Q4 2026.
The Park Road Underpass
Designed to grant completely signal-free access by eliminating the heavy intersection gridlock near Zone 4's key junction, this project has seen accelerated momentum.
- Current Status: Following the successful completion of major capital underpasses by the CDA, structural engineering and excavation at the Park Road underpass site have gained massive traction. The piling phase and the structural barrel walls are currently being cast, with round-the-clock shifts deployed to minimize temporary traffic diversions along Main Park Road.
- Expected Completion Date: Following the expedited engineering model used for recent capital fast-track projects, the underpass structure is projected to be fully opened for traffic by late December 2026.
Real Estate Valuation and Property Trends (2026 Update)
Infrastructure investments directly correlate with capital gains. Property values along this corridor have seen sharp, upward trajectory shifts since the road's grading began. The secondary market for DHA Margalla Enclave is highly active following its successful balloting cycles, with plot files trading at significant premiums (resale profit or "own") above their original base launch figures.
Official Payment Plan vs. Live Market Trading Prices
| Plot Size | Official Launch Price (Lump-Sum Base) | 3-Year Installment Plan Price | Active Market Value (Base + Resale Profit) |
|---|---|---|---|
| 5 Marla (125 Sq. Yds) | PKR 1.55 Crore | PKR 1.80 Crore | PKR 1.40 Crore – PKR 1.85 Crore |
| 10 Marla (250 Sq. Yds) | PKR 3.00 Crore | PKR 3.51 Crore | PKR 3.00 Crore – PKR 3.60 Crore |
| 1 Kanal (500 Sq. Yds) | PKR 5.60 Crore | PKR 6.53 Crore | PKR 5.60 Crore – PKR 7.15 Crore |
Main Jinnah Avenue Commercial Strip Valuation
The up-to-300-foot wide Main Jinnah Avenue commercial frontage is specifically zoned for high-density corporate high-rises and premium retail setups:
- 133 Sq. Yds Commercial (LG+G+1 / G+2): Base Reserve Price starts at PKR 11.00 Crore
- 266 Sq. Yds Commercial (LG+G+5 / G+6): Base Reserve Price starts at PKR 33.60 Crore
Tax Assessments & Verification Note: Current Federal Board of Revenue (FBR) District Collector (DC) valuations for calculating advance taxes stand firmly at PKR 6,900,000 for 5 Marla and PKR 13,750,000 for 10 Marla. DHA Islamabad enforces flat transfer fees (PKR 77,000 for 5 Marla, PKR 177,000 for 10 Marla, and PKR 191,000 for 1 Kanal) on secondary market transfers.
Future Expansion: The Eastern Bypass Plan
This 6-lane expansion is a critical component of Islamabad's master urban layout. It effectively breathes new life into the region formerly designated as the long-stalled "Kuri Model Village," transforming it into a high-end luxury enclave. Future development phases involve extending this arterial road past the outer boundaries of Park View City and through the back contours of Bani Gala, ultimately creating a direct link to the Srinagar Highway. Once finalized, this network will form a comprehensive eastern bypass, drastically reducing cross-city commercial traffic through central capital sectors. For real estate investors and homebuyers looking for long-term capital gains or luxury living within 15 minutes of Islamabad's financial district, the completion of this 6-lane link marks a definitive closing window on early-stage property values.
Frequently Asked Questions (FAQs)
What is the new 6-lane road project in Zone 4 Islamabad?
It is a major expansion of Main Jinnah Avenue (formerly Kuri Road) into a 6-lane, 220-to-300-foot-wide boulevard that cuts through DHA Margalla Enclave and links directly with the main entrance of Park View City, bypassing older congested routes.
Is DHA Margalla Enclave a legal housing society?
Yes. DHA Margalla Enclave is a premium, fully approved joint venture project between the Capital Development Authority (CDA) and the Defence Housing Authority (DHA) Islamabad, ensuring complete regulatory compliance and investment protection.
How long does it take to reach Zero Point from Park View City via the new road?
With the inclusion of the signal-free Park Road Underpass, the estimated travel time from the core of Park View City to Zero Point or the Blue Area is approximately 15 minutes.
What are the standard plot sizes in DHA Margalla Enclave?
The residential blocks offer 5 Marla (125 Sq. Yds), 10 Marla (250 Sq. Yds), and 1 Kanal (500 Sq. Yds) residential plots. The main commercial fronts along Jinnah Avenue feature larger 133 and 266 Sq. Yds commercial plots.
Disclaimer
Milkiyat.com Property Portal
The information, pricing data, and timelines regarding DHA Margalla Enclave and Park View City are for informational purposes only and do not constitute financial or legal investment advice. Real estate market values and premiums ("own") change rapidly. Milkiyat.com is an independent digital portal and is not affiliated with the developers. Investors must conduct independent due diligence and verify all details directly with official CDA, DHA, or Vision Group offices before making any financial commitments.