Main Jinnah Avenue Asphalt Carpeting
The transformation of Jinnah Avenue into a sprawling 6-lane boulevard is moving through its final structural phases.
- Current Status: Heavy earthwork, grading, and base-course preparation are 100% complete across the core DHA Margalla Enclave and Park View City approach sectors. Asphalt carpeting is underway on the main boulevard as well as the connecting internal 40-foot streets of Blocks ME-1 and ME-2. Engineering teams are laying the underground utility networks (sewerage, water lines, and fiber-optic grids) ahead of the final surface paving to prevent future road cutting.
- Expected Completion Date: Final asphalt carpeting and lane markings on the primary corridor are on track for full operational completion by late Q3 2026 / early Q4 2026.
The Park Road Underpass
Designed to grant completely signal-free access by eliminating the heavy intersection gridlock near Zone 4's key junction, this project has seen accelerated momentum.
- Current Status: Following the successful completion of major capital underpasses by the CDA, structural engineering and excavation at the Park Road underpass site have gained massive traction. The piling phase and the structural barrel walls are currently being cast, with round-the-clock shifts deployed to minimize temporary traffic diversions along Main Park Road.
- Expected Completion Date: Following the expedited engineering model used for recent capital fast-track projects, the underpass structure is projected to be fully opened for traffic by late December 2026.
Real Estate Valuation and Property Trends (2026 Update)
Infrastructure investments directly correlate with capital gains. Property values along this corridor have seen sharp, upward trajectory shifts since the road's grading began.
The secondary market for DHA Margalla Enclave is highly active following its successful balloting cycles, with plot files trading at significant premiums (resale profit or "own") above their original base launch figures.
Official Payment Plan vs. Live Market Trading Prices
| Plot Size | Official Launch Price (Lump-Sum Base) | 3-Year Installment Plan Price | Active Market Value (Base + Resale Profit) |
|---|
| 5 Marla (125 Sq. Yds) | PKR 1.55 Crore | PKR 1.80 Crore | PKR 1.40 Crore – PKR 1.85 Crore |
| 10 Marla (250 Sq. Yds) | PKR 3.00 Crore | PKR 3.51 Crore | PKR 3.00 Crore – PKR 3.60 Crore |
| 1 Kanal (500 Sq. Yds) | PKR 5.60 Crore | PKR 6.53 Crore | PKR 5.60 Crore – PKR 7.15 Crore |
Main Jinnah Avenue Commercial Strip Valuation
The up-to-300-foot wide Main Jinnah Avenue commercial frontage is specifically zoned for high-density corporate high-rises and premium retail setups:
- 133 Sq. Yds Commercial (LG+G+1 / G+2): Base Reserve Price starts at PKR 11.00 Crore
- 266 Sq. Yds Commercial (LG+G+5 / G+6): Base Reserve Price starts at PKR 33.60 Crore
Tax Assessments & Verification Note: Current Federal Board of Revenue (FBR) District Collector (DC) valuations for calculating advance taxes stand firmly at PKR 6,900,000 for 5 Marla and PKR 13,750,000 for 10 Marla. DHA Islamabad enforces flat transfer fees (PKR 77,000 for 5 Marla, PKR 177,000 for 10 Marla, and PKR 191,000 for 1 Kanal) on secondary market transfers.
Future Expansion: The Eastern Bypass Plan
This 6-lane expansion is a critical component of Islamabad's master urban layout. It effectively breathes new life into the region formerly designated as the long-stalled "Kuri Model Village," transforming it into a high-end luxury enclave.
Future development phases involve extending this arterial road past the outer boundaries of Park View City and through the back contours of Bani Gala, ultimately creating a direct link to the Srinagar Highway. Once finalized, this network will form a comprehensive eastern bypass, drastically reducing cross-city commercial traffic through central capital sectors.
For real estate investors and homebuyers looking for long-term capital gains or luxury living within 15 minutes of Islamabad's financial district, the completion of this 6-lane link marks a definitive closing window on early-stage property values.
Frequently Asked Questions (FAQs)
What is the new 6-lane road project in Zone 4 Islamabad?
It is a major expansion of Main Jinnah Avenue (formerly Kuri Road) into a 6-lane, 220-to-300-foot-wide boulevard that cuts through DHA Margalla Enclave and links directly with the main entrance of Park View City, bypassing older congested routes.
Is DHA Margalla Enclave a legal housing society?
Yes. DHA Margalla Enclave is a premium, fully approved joint venture project between the Capital Development Authority (CDA) and the Defence Housing Authority (DHA) Islamabad, ensuring complete regulatory compliance and investment protection.
How long does it take to reach Zero Point from Park View City via the new road?
With the inclusion of the signal-free Park Road Underpass, the estimated travel time from the core of Park View City to Zero Point or the Blue Area is approximately 15 minutes.
What are the standard plot sizes in DHA Margalla Enclave?
The residential blocks offer 5 Marla (125 Sq. Yds), 10 Marla (250 Sq. Yds), and 1 Kanal (500 Sq. Yds) residential plots. The main commercial fronts along Jinnah Avenue feature larger 133 and 266 Sq. Yds commercial plots.
Disclaimer
Milkiyat.com Property Portal
The information, pricing data, and timelines regarding DHA Margalla Enclave and Park View City are for informational purposes only and do not constitute financial or legal investment advice. Real estate market values and premiums ("own") change rapidly. Milkiyat.com is an independent digital portal and is not affiliated with the developers. Investors must conduct independent due diligence and verify all details directly with official CDA, DHA, or Vision Group offices before making any financial commitments.