Can You Build in Faisal Town Phase 2 Yet ? Map Approval, Bylaws and 5, 8 and 10 Marla Build Costs

Guide

Plot sizes in Mumtaz City appear as marla and as feet. See what 25x50, 30x60, 35x70 and 50x90 mean, what RDA rules allow and how to check a size.
Compare F-7/1 to F-7/4 on plot sizes, asking price per sq yd, nearby markets and buyer fit, so you can pick the right F-7 sub-sector to buy in.
A tenant guide to renting an office in D-12 Islamabad covering Markaz plazas, sizes, floors, rent benchmarks, approved use, agreements and a checklist.
Explore 1 bed apartment prices in Park View City Islamabad, including project comparisons, apartment sizes, price per sq ft, lake-facing views and buying options.
This guide covers building on a plot. For possession and other charges, see our possession guide
Plot buyers in Faisal Town Phase 2 often ask the same question first: when can I build? The honest answer is that the developer hasn't published a way to do it, and the Faisal Town Phase 2 construction timeline starts with possession, which it puts years away.
This guide covers what is and isn't known about map approval, building bylaws and the cost of a 5, 8 or 10 marla house. For the scheme as a whole, see our Faisal Town Phase 2 guide.
If you want to see what plots are being offered, the Faisal Town Phase 2 listings page shows current asks. One caution: the developer's own pages say the Phase 2 NOC is not yet approved by the Rawalpindi Development Authority (RDA).
On the evidence we can verify, no. Three things stand in the way.
First, possession. The developer's FAQ says plot possession "is expected to be granted in 3 to 4 years". Its page gives no start date for that period.
Second, approval. The developer's pages say the Phase 2 NOC isn't approved. RDA's show-cause notice of 31 October 2023 said Phase II was being launched without approval and ordered a stop to development, advertising and plot sales.
Third, rules. We found no published procedure for getting a building plan approved in this scheme. Absence of a published rule isn't proof that none exists, but it means a buyer can't check one.
The main Phase 2 page talks about the scheme's construction, not yours. It says "almost all the groundwork" is complete, that the 350-foot boulevard is "fully developed and operational" and that "construction in various areas" is going on at a rapid pace. Its FAQ says 90% of the land is levelled and more than 6,000 heavy machines are working.
These are developer claims with no independent check. The page says nothing on bylaws, house construction or building plan approval. The booking-process page doesn't either.
Two approvals are easy to confuse.
The first is the scheme's own approval: the layout plan and the NOC. That is what RDA has not given, according to the developer's pages.
The second is approval of a single house's building plan, often called a map. In RDA's area this falls under the rules RDA cites for enforcement, the Punjab Development of Cities Act 1976 and the RDA Building and Zoning Regulations 2021. We haven't read those regulations in full and don't state their limits here.
What matters for a buyer is the order. A house plan sits on top of an approved scheme. If the scheme lacks approval, we found no route to get a plan approved, and the developer doesn't describe one.
RDA's enforcement shows how seriously it treats this:
Neither case involves Faisal Town. Both show that building without approvals can lead to sealing or a stop order.
The developer publishes no bylaws for Phase 2. That means we can't tell you the permitted covered area, setbacks, number of floors or boundary-wall rules. Be wary of anyone who quotes them without a document.
One rule is worth asking about. The scheme is close to the New Islamabad International Airport, which the developer puts at about 5 minutes away. The Express Tribune reported in 2020 that aviation clearance applied to high-rises within 15 km of the airport, and that RDA wanted individual houses in a CAA-cleared scheme to need no separate clearance. That was a proposal, and the report is six years old. Ask whether any height limit applies to your plot.
Possession is "3 to 4 years" away. The developer's residential schedule has 18 instalments, which on our reading of its page run about four and a half years from booking. So a buyer on that plan could still be paying for the plot when the plot is handed over.
That matters for building. You may need to fund a house while instalments are still due, and the developer doesn't say whether it allows building before the last instalment is paid. Ask.
Searches for the cost to build 5 marla house 2026 return many figures, but no approved source we found gives a 2026 rate per square foot. What exists are material prices and one house benchmark, all from Rawalpindi.
| Item | Figure | Source and date |
|---|---|---|
| Cement, 50 kg bag | Rs1,596, up 14.38% from Rs1,395 a year earlier | Dawn, 11 Oct 2026, citing PBS |
| Steel | Rs255,000 per ton | The Express Tribune, 22 Dec 2025 |
| Bricks, top quality | Rs25,000 per thousand | The Express Tribune, 22 Dec 2025 |
| Mason, per day | Rs2,500 | The Express Tribune, 22 Dec 2025 |
| Labourer, per day | Rs1,500 | The Express Tribune, 22 Dec 2025 |
| Four-marla double-storey house | More than Rs10 million, against Rs7.5 to 8 million three to four years earlier | The Express Tribune, 22 Dec 2025 |
The Tribune's 13 January 2026 report gives steel at Rs260,000 per ton. Its cement figure there reads Rs14,500 per bag, which looks like a misprint, so we haven't used it.
A figure for "cost per square foot" can mean very different things. Ask a contractor to split the quote.
Grey structure is the shell: foundations, walls, floors and roof, before any finishing. Finishing covers plaster, flooring, paint, doors, windows, kitchen, bathrooms, wiring and fittings. Many quotes cover only the first.
Also ask what is left out. Common gaps are the architect's fee, the plan approval fee, the boundary wall and the utility connections. We found no published fee schedule for any of these in Phase 2.
The benchmark gives a way to estimate. It says a four-marla double-storey house costs more than Rs10 million. Divide that by the plot's area and you get a rate per square foot of plot, which we scale to the developer's sizes. It's rough, and it's a floor because the report says "more than".
The report doesn't say which marla it uses. A standard Rawalpindi marla is 272.25 sq ft; the developer's is 225 sq ft. We show both ends.
| Plot (developer's sizes) | Plot area (sq ft) | Rough house cost (Rs lac) | Plot price on instalments (Rs lac) | Plot's share of plot plus house |
|---|---|---|---|---|
| 5.56 marla (25 x 50 ft) | 1,250 | 115 to 139 | 27.95 | 17% to 20% |
| 8 marla (30 x 60 ft) | 1,800 | 165 to 200 | 38.25 | 16% to 19% |
| 10.89 marla (35 x 70 ft) | 2,450 | 225 to 272 | 49.25 | 15% to 18% |
Larger plots often have a lower share of covered area, so the upper figures for the bigger plots probably overstate. Treat the table as an order of magnitude, not a quote.
The point stands either way. Whatever you pay for the plot, the house costs several times as much. And these are today's prices, while possession is years away. Cement alone rose 14.38% in the year to early October 2026.
When a contractor says "5 marla", ask for square feet. The developer's 25 x 50 ft plot is 1,250 sq ft, which the developer calls 5.56 marla. At a standard 272.25 sq ft marla, that is only about 4.6 marla. The 8 marla plot is about 6.6 standard marla, and the 10.89 marla plot is about 9. A quote for "5 marla" may describe a different area from your plot.
Get every quote in square feet of covered area, floor by floor.
On the evidence we can verify, no. The developer expects possession in 3 to 4 years, publishes no building process, and says the NOC isn't approved.
The developer doesn't publish them. Ask for the document before relying on any covered area, setback or height rule.
We found no published process. The scheme's own approval comes first, and the developer says the NOC isn't approved.
No approved source gives a 2026 rate. Scaling one Rawalpindi benchmark suggests roughly Rs115 to 139 lac for the 25 x 50 ft plot. Get quotes in square feet.
Cement rose 14.38% in the year to 8 October 2026 (Dawn, citing PBS), and steel and labour were already high in late 2025.
The developer doesn't say. Ask in writing whether building is allowed before the last instalment, and what possession requires.
RDA has sealed buildings and halted construction in other schemes for lacking approvals and NOCs. We found no case involving Faisal Town.
By our rough estimate, four to five and a half times the instalment price of the plot.