Guide
SBCA Reform Framework 2026: What It Means for Buyers and Builders

Guide

A tenant guide to renting an office in D-12 Islamabad covering Markaz plazas, sizes, floors, rent benchmarks, approved use, agreements and a checklist.
Explore 1 bed apartment prices in Park View City Islamabad, including project comparisons, apartment sizes, price per sq ft, lake-facing views and buying options.
Explore apartments for sale in Park View City Islamabad, including 1, 2 and 3-bed units, project details, price comparisons, payment plans and buyer guidance.
A tenant guide to renting an office in F-10 Islamabad covering Markaz plazas, sizes, floors, rent benchmarks, approved use, agreements and a checklist.
By Maham Imtiaz
Real Estate AnalystVerified author
9 min read
The Sindh Building Control Authority has spent the past year under more pressure than at any time in its history. The Lyari collapse of July 2025 killed 27 people, the Gul Plaza fire of January 2026 killed 80, and both inquiries pointed back to weak building control. The Sindh government's answer has been a series of reforms: a new enforcement framework in February 2026, tighter directions in July, a draft law to replace the 1979 Ordinance, and the return of town-level building control in October.
For anyone buying or building in Karachi, these reforms change who you deal with, how quickly approvals move and how hard SBCA is supposed to come down on violations. Our guide on how to verify property in Karachi explains that SBCA's records are the core of the building layer of any purchase, and the reforms are meant to make those records more reliable and easier to check.
This guide sets out what has been announced and what has actually changed, separates proposals from law in force, and explains what each reform means in practice for buyers and for builders.
| Event | What it exposed |
|---|---|
| Lyari collapse, July 2025 | A building declared hazardous in 2023 still occupied; SBCA officials named in the FIR |
| Dangerous buildings list | 588 Karachi buildings declared dangerous; only 59 evacuated by July 2026 |
| Gul Plaza fire, January 2026 |
| Shop count beyond the approved plan; no SBCA inspection for 23 years |
| Judicial commission, August 2026 | SBCA faulted for inspecting only after complaints |
| Public Accounts Committee, July 2026 | 58 illegal housing schemes operating without NOCs |
On 21 February 2026, Sindh's local government minister announced a reform and enforcement framework for SBCA.
| Area | Measure |
|---|---|
| Enforcement | Special Anti-Illegal Construction Task Force, to be set up immediately |
| Surveillance | Drone surveillance for real-time detection; mandatory drone surveys in densely populated areas |
| Approvals | Category I fully online; Categories II and III moving online; Category IV to be linked to the Sindh Business One Stop Shop |
| Access | Single Window Facility extended to all SBCA regions |
| Records | Thousands of approval files and legacy records being digitised to curb manipulation |
| Complaints | Geo-tagged online complaint tracking system |
| Safety | Stronger monitoring of dangerous buildings and protection for heritage structures |
The framework is an administrative plan, not a change in the law. It sets priorities and creates new units, but SBCA's legal powers still come from the 1979 Ordinance.
On 30 July 2026, the minister gave SBCA 15 days to identify illegal constructions and complete the scrutiny of records, after which officials found involved in or negligent about unauthorised buildings would face disciplinary action. The meeting also ordered:
In October 2026, SBCA restored a town-level administrative system in Karachi, replacing the district-based structure used since 2010. It now operates through the city's 25 towns, each with its own directors, deputy directors, assistant directors and senior building inspectors. Our report on how SBCA introduced its town-wise building control system explains how the towns are organised.
For buyers, this means a named local office responsible for approvals and enforcement in each area, and a clearer target for complaints.
After the Lyari collapse, the Sindh government drafted a Sindh Building Control Authority Act to replace the 1979 Ordinance. As of October 2026, it has not been reported as passed.
| Feature | Current law (SBCO 1979) | Draft SBCA Act 2025 |
|---|---|---|
| Enforcement body | SBCA officers with police help | A dedicated "SBCA Force" |
| Governance | SBCA under the local government department | An 11-member governing body chaired by the local government minister, including engineering, architecture and university representatives |
| Offences | Compoundable within limits | Cognizable, non-bailable and non-compoundable |
| Maximum imprisonment | 3 years | 5 years |
| Fine | At least Rs50,000, plus Rs500 a day | Up to Rs5 million |
| Cantonments | Outside SBCA | Still excluded |
The penalties under the current law are set out in the Sindh Building Control Ordinance 1979, which remains in force until any new Act is passed and notified.
| Reform | What it means for you |
|---|---|
| Digitised approval records | Approvals should be easier to verify and harder to forge |
| Town-level offices | A local office to confirm a building's status |
| Online complaints | A trackable way to report a builder or neighbour |
| Task force and drones | More detection of unapproved floors in buildings you might buy into |
| Tougher draft penalties | If passed, stronger deterrence against builders, not compensation for buyers |
What the reforms do not change is just as important. A building approved on paper can still deviate from its plan, and buyers in unapproved buildings still have no protection in court. The checks before paying remain the buyer's job.
| Reform | What it means for builders |
|---|---|
| Faster online approvals | Shorter waits for compliant plans |
| Drone surveillance | Deviations more likely to be detected during construction |
| Officer accountability | Less room for informal "settlements" with inspectors |
| Draft Act | If passed, non-compoundable offences and up to Rs5 million fines |
| Commercialisation rules | Land-use changes possible again on notified roads, but only with approvals |
Disasters have been the main driver of SBCA reform so far. Our report on the Gul Plaza fire probe and commercial property safety shows how the latest inquiry shaped the agenda.
Several reforms are announced but not yet visible on the ground. Buyers and builders should watch for:
The draft Act would raise maximum imprisonment by two-thirds. From 3 to 5 years: (5 − 3) ÷ 3 = about 67% longer.
The proposed maximum fine is 100 times the current minimum. Rs5,000,000 ÷ Rs50,000 = 100 times.
Karachi now has more building control units than before 2010. The earlier town system had 18 towns; the restored system has 25: 25 − 18 = 7 more, about 39% more local units.
Town-level control was gone for 16 years. Discontinued in 2010 and restored in 2026: 16 years.
Evacuations lag the dangerous buildings list. 59 evacuated ÷ 588 dangerous buildings = about 10% by July 2026.
Seven months passed between the Lyari collapse and the framework. From July 2025 to February 2026 is about 7 months.
| Check | Where |
|---|---|
| Approved plan, confirmed digitally | SBCA |
| Local town office's view of the building | SBCA town office |
| Not on the dangerous buildings list | SBCA |
| Sale NOC for off-plan units | SBCA |
| No pending complaint or notice | SBCA complaint system |
| Completion plan for finished buildings | SBCA |
A. A set of measures announced on 21 February 2026, including an anti-illegal construction task force, drone surveillance, online approvals, single windows in all regions, digitised records and an online complaint system.
A. Not as of October 2026. The draft Sindh Building Control Authority Act was shared with stakeholders in 2025 but has not been reported as passed. The 1979 Ordinance remains in force.
A. Up to five years' imprisonment and fines up to Rs5 million, with offences made cognizable, non-bailable and non-compoundable.
A. Since October 2026, SBCA operates through Karachi's 25 towns, each with its own directors and building inspectors, replacing the district structure used since 2010.
A. No. They aim to detect and stop illegal construction earlier, but buyers in unapproved buildings still have no protection and must pursue the builder.
A. SBCA was given 15 days to identify illegal constructions and scrutinise records, with disciplinary action for negligent officials, daily surveillance reports and dedicated demolition teams.
A. No. SBCA's jurisdiction, and the draft Act, exclude cantonment areas, where the cantonment boards and DHA regulate construction.
This guide is for general information. SBCA's reforms, structure and the draft law are still evolving, and buyers and builders should confirm the current position with SBCA and a qualified lawyer before relying on any announced change.